Ben9108  +  181090 Tue, 10 Jan 06 02:32 PM

Referring to site inspection with architect, consultant, and relevant parties dated 10 Dec 2005, we are instructed to relocate some heaters in mock up flats at tower II. We would report that maintenance problem of heaters have been found at room No.3 In addition, there are cost implication incurred for the relocation of heaters. The scope of work is quantified as follows.

>>>>>>>>>>>>>>> 

Detail quotation will be submitted shortly and part plan drawing are enclosed for your reference.

(Give me comment on grammar, language etc to my writing)

Joined on Mon, Aug 29 2005
Full Member 241
davkett  +  181157 Tue, 10 Jan 06 04:55 PM

In reference to the site inspection by the architect, consultant, and relevant parties, dated 10 Dec. 2005, we are instructed to relocate some heaters in the mock-up flats at Tower II.  We report that a maintenance problem with the heaters has been found at room No.3.   In addition, there are costs incurred for the relocation of the heaters. The scope of the work is quantified as follows.

>>>>>>>>>>>>>>> 

A detailed quotation will be submitted shortly.

A  part (parts?) plan drawing is enclosed for your reference .

(Does this help?)

Joined on Tue, Jun 7 2005
Pennsylvania, USA
Senior Member 2,788
"The rose stays fresh in its name..." -Bernard of Morlay
davkett  +  181158 Tue, 10 Jan 06 04:57 PM

In reference to the site inspection by the architect, consultant, and relevant parties, dated 10 Dec. 2005, we are instructed to relocate some heaters in the mock-up flats at Tower II.  We report that a maintenance problem with the heaters has been found at room No.3.   In addition, there are costs incurred for the relocation of the heaters. The scope of the work is quantified as follows.

>>>>>>>>>>>>>>> 

A detailed quotation will be submitted shortly.

A  part (parts?) plan drawing is enclosed for your reference .

(Does this help?)

Ben9108  +  181207 Tue, 10 Jan 06 05:59 PM

The joint site inspection has conducted on 10 Dec 2005 with architect, consultant and relevant parties. During that inspection, we are required to relocate some heaters in mock up flats at Tower II. Based on the modification, please be informed that the new location of hearter at room no.3 have difficulty in repairing work in future. Moreover, there is time and cost implication incurred concerning the modification work. The additional work is quantified as bellows.

Help me to comment

davkett  +  181235 Tue, 10 Jan 06 06:30 PM

The joint site inspection was/has been conducted on 10 Dec 2005 with the architect, consultant and relevant parties.  That inspection resulted in our requirement to relocate some heaters in the mock-up flats at Tower II.  Please be informed that, based on the modification plan, the new location of the heater in room no.3 will pose some difficulty for any future repairs.  The modification work will involve increased time and costs. The additional work is quantified as below.

© MediaCet Ltd. 2009, v5.0.3614.32638. All content posted by our users is a contribution to the public domain, this does not include imported usenet posts.*
For web related enquires please contact us on webmaster@mediacet.com, status updates are available at status.mediacet.com.
*Usenet post removal: Use 'X-No-Archive'. You may not have understood that your posts would end up in the public domain. Please send proof of the poster's email, we will remove immediately.