+0
How to make electrical quotation
Comments  
In general, quotations for construction work show a breakdown in costs according to labor, materials, and equipment, for example (labor would be based on payroll costs, material on invoice costs, equipment as though it was rented from an equipment rental place, and there might be standard industry markups for labor and materials and sales tax - not shown below):

Quotation for work to rewire house at ___ Main St., Los Angeles, Calif.:

Labor:

2 electricians at 20.00/hr. at 16 hours each = .........640.00

1 electrician apprentice at 10.00/hr. at 8 hrs. each = 80.00

1 groundman at 15.00/hr. at 8 hrs. each = ..............120.00

Total labor:................................................................840.00

Markup for labor: .........................................................0.00

Materials:

300 ft. wire at 2.00/ft. = ............................................600.00

Total material: ...........................................................600.00

Markup for materials: ....................................................0.00

Equipment:

2 pickup trucks at 5.00/hr. at 16 hrs. each = .............160.00

1 bucket truck at 8.00/hr. at 16 hrs. each = ...............128.00

Total equipment: ........................................................288.00

Total for labor, materials, and equipment:.................1728.00

Sales tax: ........................................................................0.00